Placement in five easy steps
1 Step
Fix each Hidrocell geocell with the clipping system on the surface to be paved.
2 Step
Cover the desired surface with the Hidrocell geocell assembled with the jumpers strut up.
3 Step
Place the geotextil on the Hidrocell geocells.
4 Step
Install the ecoDraining concrete pieces on the geotextile layer.
5 Step
Anchor the ecoDrainig slabs with the crossheads of the Hidrocell geocells for its complete fixation.